APRIL Sustainability DashboardAPRIL Sustainability Dashboard
  • Sampaikan Keluhan
  • English
  • Indonesian
APRIL Sustainability DashboardAPRIL Sustainability Dashboard
  • Sampaikan Keluhan

PT. Essa Indah Timber

By Digital Team | Agustus 26, 2019 | 0
Posted in Daftar penilaian NKT Pemasok

Leave a Comment Cancel Reply





This site uses Akismet to reduce spam. Learn how your comment data is processed.

Search

Recent Posts

  • Laporan Pertemuan SAC ke-20 (28 Jan 2021)
  • Ringkasan Laporan Penilaian Nilai Konservasi Tinggi dan Stok Karbon Tinggi Terintegrasi Di PT Bukit Raya Mudisa, Sumatera Barat, Indonesia
  • Laporan Pertemuan SAC ke-19 (16 Okt 2020)
  • IPEWG Special Meeting Note
  • Laporan Pertemuan SAC ke-18

Recent Comments

    Archives

    • Maret 2021
    • Februari 2021
    • November 2020
    • Agustus 2020
    • Juli 2020
    • Januari 2020
    • November 2019
    • Oktober 2019
    • September 2019
    • Agustus 2019
    • Juli 2019

    Categories

    • 2018 SFMP 2.0 Full Assurance Report
    • Adendum Kebijakan Pengelolaan Hutan Berkelanjutan
    • APRIL Partners
    • APRIL Suppliers
    • Daftar penilaian NKT Milik APRIL
    • Daftar penilaian NKT Pemasok
    • Grievance Tracking
    • Kebijakan Pengelolaan Hutan Berkelanjutan (SFMP 2.0)
    • Laporan Interim Assurance SFMP 2.0 Tahun 2016
    • Laporan Interim Assurance SFMP 2.0 Tahun 2017
    • Laporan Kemajuan SAC
    • Laporan Penuh Assurance SFMP 2.0 Tahun 2016
    • Laporan Pertemuan IPEWG
    • Laporan Pertemuan Pemangku Kepentingan SAC
    • Laporan Pertemuan SAC
    • Local communities and NGOs
    • Penilaian HCV tidak dilakukan
    • Peta Jalan Lahan Gambut APRIL-IPEWG
    • Publikasi Terkait

    Meta

    • Daftar
    • Masuk
    • Feed entri
    • Feed komentar
    • WordPress.org

    Disclaimer:
    This site contains confidential information concerning the APRIL Group. All content and images on this site are owned or licensed by APRIL Group and protected by copyright and other intellectual property rights. Any redistribution or reproduction of some part or all content and images on this site is prohibited. By entering this site, you agree to not use this site in any way that is unlawful, illegal, fraudulent or harmful, or in connection with any unlawful, illegal, fraudulent or harmful purpose or activity.

    • Hubungi Kami
    • Tentang APRIL
    • Ketentuan Penggunaan
    • Kebijakan Privasi
    • Temukan kami di Linkedin
    • APRIL Dialog

    Dokumen yang berkaitan

    Laporan SFMP Assurance Tahun 2020

    Laporan Keberlanjutan APRIL 2019

    Copyright © Asia Pacific Resources International Holdings Ltd 2019. All Rights Reserved.

    DOWNLOAD FORM

    Please fill in this form to receive the online version of 2020 SFMP 2.0 Assurance Report.

    DOWNLOAD FORM

    Please fill in this form to receive the online version of APRIL Sustainability Report 2019.

    FORM UNDUHAN

    Silahkan mengisi form ini untuk mengunduh Laporan SFMP Assurance Tahun 2020.

    FORM UNDUHAN

    Silahkan mengisi form ini untuk mengunduh Laporan Keberlanjutan APRIL 2019.

    SAMPAIKAN KELUHAN

    Detail kontak dan form isian

    Mohon mengunduh form penyampaian keluhan di bawah ini untuk diisi dan dikirimkan kembali ke  grievance_response@aprilasia.com

    Alternatif lain untuk menyampaikan keluhan:

    • Via telepon: +62 21 3193 0134
    • Melalui surat tertulis kepada: APRIL Group, Jalan MH. Thamrin No. 31, Jakarta 10230, Indonesia (ditujukan kepada Departemen Sustainability – Koordinator Grievance)
    Form Sampaikan Keluhan

    GRIEVANCE SUBMISSION

    Contact details and submission form

    Please kindly download the grievance submission form below, complete and return it to  grievance_response@aprilasia.com

    Alternative means to lodge a grievance:

    • Via telephone at: +62 21 3193 0134
    • In writing to: APRIL Group, Jalan MH. Thamrin No. 31, Jakarta 10230, Indonesia (Attention: Sustainability Department – Grievance Coordinator)
    Grievance Submission Form

    I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

    I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

    PT RAPP and Supply Partner plantations supplied 71% of the total fiber to the Kerinci mill for pulp production and all of this was plantation fiber.

    Findings:
    Non-conformances 1

    • Beranda
    • Kebijakan Pengelolaan Hutan Berkelanjutan (SFMP 2.0)
    • Keberlanjutan Jangka Panjang
      • Sumber pasokan serat kayu
      • Perubahan kapasitas pabrik dalam konsumsi serat kayu
      • Pengukuran Nilai Konservasi Tinggi (NKT)
      • Total area yang dikembangkan pada area tak berhutan
      • Pengembangan lahan baru yang dilakukan secara tidak sesuai
    • Konservasi dan Perlindungan Hutan
      • Area konservasi dan restorasi
      • Perubahan area konservasi dan restorasi
      • Spesies langka, terancam dan hamper punah
    • Pengelolaan Lahan Gambut
      • Total area hutan tanaman industri pada lahan gambut
      • Total area konservasi dan restorasi pada lahan gambut
      • Tentang Kelompok Kerja Ahli Gambut Independen (IPEWG)
      • Laporan Pertemuan IPEWG
      • Peta Jalan Lahan Gambut APRIL-IPEWG
    • Pengurangan Jejak Karbon Secara Berkesinambungan
      • Total emisi Gas Rumah Kaca Scope 1
      • Intensitas emisi gas rumah kaca
      • Konsumsi listrik
      • Konsumsi energi berdasarkan jenis bahan bakar
    • Dukungan yang Proaktif dari Masyarakat Lokal
      • Proyek infrastruktur sosial
      • Beasiswa pendidikan
      • Pelatihan Sistem Pertanian Terpadu (IFS)
      • Program Desa Bebas Api (FFVP)
    • Menghormati Hak-Hak Masyarakat Hukum Adat dan Komunitas
      • Area inaktif akibat konflik lahan PT RAPP
      • Prosedur Penanganan Keluhan
      • Pelacakan Keluhan
      • Pelibatan Pemangku Kepentingan APRIL
    • Praktik-Praktik Bertanggungjawab di dalam Wilayah Kerja Kami
      • Sertifikat Kesehatan dan Keselamatan Kerja (K3)
      • Kejadian fatal dan kecelakaan
      • Mekanisme Penanganan Keluhan untuk Pekerja
      • Tenaga Kerja
    • Kepatuhan Hukum dan Sertifikasi
      • Legalitas Serat Kayu
      • Kejadian Kebakaran
    • Tata Kelola Perusahaan yang baik , Verifikasi dan Transparansi
      • Uji Kelayakan Pemasok
      • Tentang Komite Penasihat Pemangku Kepentingan (SAC)
      • Laporan Kemajuan SAC
      • Laporan Pertemuan SAC
      • Laporan Pertemuan Pemangku Kepentingan SAC
    • Adendum Kebijakan Pengelolaan Hutan Berkelanjutan (SFMP 2.0)
    • Kebijakan Asosiasi
    • Repositori